| HDP
Boom is a rugged permanent solution for high flow
areas. Typical installations include hydro power
tail race installation |
HDP
Boom is deployed in difficult terrain to protect a
national park from power station outfalls |
HDP
Skirt replacement after 17 years of
deployment 70% of floats suitable for reuse.
Skirt was damaged after dam level dropped and boom
became entangle in submerged trees |
 |
 |
 |
| HDP
Booms lend themselves to multi-stack installations
in combination with filter baffles and screens |
Our
installation and repair team is experienced in a
wide range of climatic conditions |
HDP
boom configured as STP baffle system using a 2.4m
skirt and fitted with regulating flow through
windows and bank contours |
 |
 |
 |
| Depending
on the length and configuration of the HDP baffle
systems on site configuration is undertaken. here
a 117m continuous baffle is fitted with floats
prior to installation |
Skirts
are workshop configured with contours freeing
ports, top wire tension members and ballast chain
pockets. Floats are bolted to skirt and ballast
inserted prior to installation |
Deep
skirted baffles are deployed with the skirts
furled to floats. once in position the skirts are
dropped and the baffle tensioned using heavy duty
SS turnbuckles |