HDP Baffles  
Home
Available Stock
Contractors Curtains
Open Water Curtains
Dredging Curtain
Choosing a Curtain
Special Applications
Containment Bunds
Weed Booms
Floating Baffles
Debris Booms
Dewatering Bags
Under Water Grout Bags
Fabrication Capability
Field Operations
 

Contact Us
Distributors

HEAVY DUTY OPEN WATER FLOATING CURTAINS 

Our sea curtain system provides a multipurpose float assembly for use with a range of skirt configurations from Heavy duty oil containment booms to heavy duty high integrity silt curtains. The individual float logs are 2m long and 300mm high foam filled HDPE through bolted reinforcing belting on the skirt assemblies. They are able to sustain hits from small vessels and are easily changed when required. In addition to use in open water conditions the float system is suitable for use on:

bulletPermanent installations for oil and debris containment/diversion at plant outfalls and intakes
bulletHeavy baffles for sewage and water treatment plants and oil field dewatering ponds
bulletPermanent installations around sensitive ship discharge and loading operations
bulletFrequent deployment around ship bunkering and transfer operations
bulletStorm water outfall and weed containment netting booms
bulletToxic algae trawls using flow through skirts
bulletHigh durability baffle systems

As a float assembly for our high integrity sediment curtains they are routinely deployed in the harshest conditions. The curtain pictured below is deployed in an southerly exposed location on Botany Bay Australia and experiences winds to 100kph and short interval wind generated waves up to 1.5m.

We fabricate components to optimise installations pictured is a fabricated  chaffing bar installed over wharf edge Our equipment inventory includes excavators for moving curtains on barges, deploying mooring systems, piling and installing shore anchors Ballast moored curtain is simultaneously deployed from a barge together with a 90mm stud link chain ballast mooring assembly
Divers inspection of sea bed Dock Toe mooring and attachment of supplementary cables Sea Curtain deployed in using ballast mooring system to minimise impact on shipping Anchor mooring assemblies comprise 250kg or 500kg flipper delta anchors. These have between 5000kgf and 10000kgf of holding capacity depending on bottom type 
Chain gypsy used to deploy ballast mooring chains for curtains deployed  in high traffic areas or close to shipping lanes/swinging basins  We recommend the use of steel dumps over concrete blocks to achieve better holding power. Pictured 6 tonne end mooring dump.

 

 

DOWNLOADS

GA HDP Baffle

GA Outfall Baffle

GA Skimmer Box Baffle

B6000 Potable Water Baffle

 
 
© Copyright January 2008 - Mentanza Pty Ltd - All Rights Reserved.